Education
PCX specializes in pre-built modular systems for the Educational Construction Market.
Key elements that are impacting the way
Educational Facilities are designed and delivered are:
- Time Dependent
Educational projects have specific seasonal opening dates that cannot be moved without a significant impact on cost. Delayed openings are not acceptable. "Offsite" systems can allow for access to permanent power sooner and conditioned space greatly accelerates the interior finishing trades. - Modular Solutions are Already Accepted Solutions
"Offsite" and Modular solutions have already demonstrated cost and time saving benefits to the Educational market. However, typical modular solutions in place are meant for temporary application and don't demonstrate accurately the quality of a typical "offsite" solution of today's standards in the electrical and mechanical deliverables. - Pressure on Reduction Cost
Guaranteed project costs regardless of the location across the county. - Energy Efficiency
Complex energy management systems require skilled installation labor and commissioning processes. This work can only be accomplished "offsite" with an integrated solution.
PCX Corporation engineers and manufactures custom pre-manufactured electrical and mechanical systems which help to streamline the construction process resulting in reduced overall construction costs and build cycles, as well as expensive change orders that result in cost overruns.
All PCX systems are engineered to meet requisite U.L. requirements and are fabricated to customer approved specifications resulting in predictive costs and scheduling.
