Retail

Retail

PCX specializes in electrical distribution and mechanical equipment centers for the Retail Construction Market. Significant improvements in Cycle Time and Cost can be realized in incorporating an offsite fabricated electrical Solution.

Key elements that are impacting the way Retail
Commercial Buildings are designed and delivered are:
  • Takeover Locations
    With the fallout of many retailers, permanent power is readily available for the taking.
    Having a complete solution available the day the Tenant Improvements begin will benefit the
    project cycle time.
  • Smaller Formats of Previous Big Box
    Dividing services and providing custom designs for tenants of varying size and scope requires solutions that can be installed quickly to meet store opening dates.
  • Increased Sales Space
    Retailers are working to minimize requirements for essential services in the store interior. "Offsite" solutions facilitate reduced wall space, organized LV systems and allow consideration for moving electrical solutions into unused overhead space.
  • More Complex Systems for Lighting and Energy
    Pressure from energy codes and sustainable practices require more complex lighting and energy management systems. Installing and commissioning these systems prior to energization reduces start up time and end user quality.
  • Central UPS Systems
    Eliminating multiple batteries and combining into a single backup power system allows for proactive management and maintenance. Integrating these systems into the prefabricated solution reduces lifetime costs and encourages proper disposal of battery systems.
  • Central Emergency lighting Systems
    Central UL 924 Emergency Lighting systems reduce landfill waste and save time and money in the installation of emergency lighting solutions.
  • LEED Qualifications
    Utilizing innovative construction techniques such as a pre-manufactured solution may support
    LEED qualification.

PCX utilizes 3D design software to offer a variety of solutions ranging from elevating your electrical room to alternative equipment arrangement. Our engineering staff has been successful in reducing the required electrical space by up to 50% over the original customer design.